At 8:45 a.m. this morning, the El Dorado Western Railway mounted the Whiting Trackmobile on the Placerville Branch in Folsom for the first time. With El Dorado Western President Keith Berry at the operator controls, the crew ran it along a one-quarter mile section of the rail to the south of Mile Post 116.
"Well boys, we're on the tracks for the first time," said Keith. The break-in run gave time to evaluate the Trackmobile and make sure no mechanical issues surfaced.
Mark Bruto (kneeling) guides Keith as he mounts the Trackmobile on the tracks as Ed Cunha watches. The process was surprisingly easy. It only took about 5 to 10 minutes.
Ed takes his turn at the controls of the Trackmobile. After Keith's initial 30-minute run, each volunteer took turns learning how to operate the Trackmobile.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment