Sunday, November 01, 2009

Railbus rear truck

Work on the rear truck to the Diamond and Caldor Railbus No. 10 is moving along. Since removing the truck in mid-September. Here's the work that the crew has done in the past three weeks:
  • Fabricate and install the end-frame T-brace
  • Design and install the differential yoke swivel pin brace -- this corrected a problem with unwanted differential movement
  • Replaced the rear differential bearing cap and spacer

No comments: