Saturday, June 21, 2008

Pressure washing

Keith Berry pressure washes the No. 3 cylinder. Sam Thomson finished his 15-long long project to resurface the valve facings on the Diamond and Caldor No. 4 two weeks ago. The crew pulled the engine out of the engine house today so Keith could clean dirt and metal shavings from around the valve surfaces.

No comments: