Saturday, April 19, 2008
Brakeman's foot boards on the railbus
Keith (left) and Albert clamped the brackets for the brakeman's foot boards on the Tally Ho Railbus No. 10 this morning. Keith said they will drill the top of two bolt holes first. After they mount the four brackets, they will tighten the bolts and square the brackets. After mounting, Keith will use a counter sink to mark the location of the bottom holes. One more trip to the drill press and the brackets permanent mounting.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment